OUR SERVICES
 
Offshore Transportation and Installation (OIC) : Track Records
Project Description Client Scope of Services
(PCC, EPC, EPCC etc.)
Description
( of Work Executed)
Transportation & Installation of Offshore facilities for Year 2014 to 2016. PETRONAS Carigali/ KPOC/ Petrofac/ HESS Oil/ EMEPMI/ Lundin Malaysia/ Talisman Malaysia/ Murphy Sarawak Oil/ JX Nippon Oil/ PCPPOC/ Shell. Transportation & Installation of Offshore Facilities for PETRONAS PMO, SKO & SBO fields (Package A: KL101) from Year 2014 to 2016. Transportation & Installation of Offshore Facilities for PETRONAS, PMO,SKO & SBO fields.
Project Description Client Scope of Services
(PCC, EPC, EPCC etc.)
Description
( of Work Executed)
Provision of EVA-NMB Gas Delivery System (ENGDS) Shore Approach for PCSB Project Global Offshore Resources Malaysia Sdn Bhd EPCC of Onshore Construction and Onshore Pipeline Installation & Assist Beach Pull Onshore Construction and Onshore Pipeline Installation (construction of cofferdam,
rockberm and MIJ installation, Flange and Pipeline Installation from KP 280.970 to
KP 281.342 (above ground and underground pipeline) at proposed beach valve
location )
· Assist Beach Pull and Pipelay (from shore landing KP 280.970 to offshore KP 280.209)
Project Description Client Scope of Services
(PCC, EPC, EPCC etc.)
Description
( of Work Executed)
Engineering, Procurement and Construction (EPC) OF NPS24 Prai Lateral Subsea Pipeline Rectification Works Project Petronas Gas Berhad Engineering design of the rectification areas, procurement of rocks and concrete matress, provision of marine spread for subsea pipeline rectification works. Repair damaged rock berms, fill up scouring area and free span correction for NPS 24 Prai Lateral Subsea Pipeline using rocks and concrete matress.
Project Description Client Scope of Services
(PCC, EPC, EPCC etc.)
Description
( of Work Executed)
Provision of 14” and 24” Export Pipeline Shore Approach Installation for Kebabangan Northern Hub Development Project at Sabah- Offshore KPOC/GOM Onshore pipeline construction and installation, shore approach pipeline installation, partial pre-commissioning, post trenching work and rock dumping. Provision of 14” and 24” Export Pipeline Shore Approach Installation for Kebabangan Northern Hub Development Project at Sabah- Offshore
Provision of Transportation and Installation of Topsides for Kebabangan Northern Hub Development Project KPOC Transportation & Installation of KBB Topside Structure (approx. 24000MT) using Floatover Vessel. (Ongoing work, the manhours is only estimated) Transportation & Installation of KBB Topside Structure (approx. 24000MT) using Floatover Vessel.
Project Description Client Scope of Services
(PCC, EPC, EPCC etc.)
Description
( of Work Executed)
28" KAKG-A / MLNG-2 Shore Approach Pipeline Work for Kumang Development Project Petronas Carigali sdn Bhd/TLO Onshore pipeline construction and installation, shore approach pipeline installation, partial pre-commissioning, midpoint tie in, post trenching work and rock dumping. 28” DIA. KAKG-A To MLNG-2 Shore Approach Pipeline Installation Work For Kumang Cluster Development Project-Offshore (CO-0417)
Project Description Client Scope of Services
(PCC, EPC, EPCC etc.)
Description
( of Work Executed)
Kepong A to Tiong A Sectional (Subsea) Pipeline Replacement Project Petronas Carigali Sdn Bhd - PMO (As Main Contractor) Engineering, Procurement, Installation and Commissioning of 10" subsea pipeline sectional (750m) replacement - exclude supply of linepipe material. Replacement of 10" x 450 m corrodded subsea pipeline (at 72 m water depth) near Kepong A platform with new line using smart flange for tie-ins to existing line.
LGAST to PML Pipeline Project Petronas Carigali Sdn Bhd/PML (As Main Contractor) Procurement, Construction and Commissioning work - exclude supply of line pipe material 12" x 12 km, Labuan FT, include 3 km of sub-sea section with two Shore Approach construction and two tie-ins work at LGAST and GRT-2 in PML new Methanol plant, which involve installation & tie-ins of receiving and metering facilities.
Project Description Client Scope of Services
(PCC, EPC, EPCC etc.)
Description
( of Work Executed)
West Lutong Pipeline Replacement Project Petronas Carigali Sdn Bhd/TLO (Sub-contractor to TLO) Offshore Transportation and Installation of Sub-sea Pipeline - PCC (exclude linepipe material) 24" x 28km, from Miri to West Lutong Platform at 0 to 34 mtr Water Depth.
Baram South Development Project Petronas Carigali Sdn Bhd /TLO (Sub-contractor to TLO) Transportation, Installation and Testing of Subsea High Tension Power Cable for Baram South Development. Transportation, Laying and Testing of 12km (BADP-A to BAKP-B) and 4 km (BAJT-H to BAKP-B) Subsea HV Cable (6" Diam) using DP1 Vessel. Laying of 6" HV Sub-sea cable BAJT to BAKB = 5KM BADPA to BAKB = 11km
West Lutong Pipeline Replacement Project Petronas Carigali Sdn Bhd/TLO (Sub-contractor to TLO) Offshore Transportation and Installation of Sub-sea Pipeline - PCC (exclude linepipe material) 24" x 28km, from Miri to West Lutong Platform at 0 to 34 mtr Water Depth.
SSB 2005 Offshore Installation Project Sarawak Shell Berhad/TLO (Sub-contractor to TLO) Pre-Comm And Commissioning - Cleaning, Gauging, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. 28" x 0.8km & 28" x 42km, Sub-sea pipeline, Offshore Sarawak at 0 to 50m water depth
Project Description Client Scope of Services
(PCC, EPC, EPCC etc.)
Description
( of Work Executed)
Baram MCOT Pipeline Replacement Project Petronas Carigali Sdn Bhd/TLO (Sub-contractor to TLO) Pipeline Construction (Shore Approach & Shallow Water) - PCC 16" x 5km MCOT Shore approach, Miri Sarawak.