Topside Major Maintenance and Hook-up Commissioning : Track Records
Project Name |
Owner |
Scope of Services (PCC, EPC, EPCC etc.) |
Description ( of Work Executed) |
Wellhead Platform (WHP) for Block PM2307 Bertam Field Development Project. |
Lundin Malaysia B.V |
Provision of Hook-Up & Commissioning (HUC) Services for Block PM307 Bertam Field Development. |
Detailed engineering, procurement, fabrication, onshore testing and pre-commissioning, transportation, hook-up & commissioning, start-up assistance and final documentation of the facilities. |
Project Name |
Owner |
Scope of Services (PCC, EPC, EPCC etc.) |
Description ( of Work Executed) |
Provision for Hook-Up, Commissioning and Topside Major Maintenance Services for 2013 To 2018. |
Newfield Peninsula Malaysia Inc. |
Detailed engineering, procurement, fabrication, onshore testing and pre-commissioning, transportation, hook-up &commissioning, start-up assistance and final documentation of the facilities for Newfield |
Detailed engineering, procurement, fabrication, onshore testing and pre-commissioning, transportation, hook-up & commissioning, start-up assistance and final documentation of the facilities for Newfield facilities at Offshore Terengganu and Offshore Sabah & Sarawak |
Provision for Hook-Up, Commissioning and Topside Major Maintenance Services for 2013 To 2018. |
Talisman Malaysia Limited. |
Detailed engineering, procurement, fabrication, onshore testing and pre-commissioning, transportation, hook-up & commissioning, start-up assistance and final documentation of the facilities for Talisman. |
Detailed engineering, procurement, fabrication, onshore testing and pre-commissioning, transportation, hook-up & commissioning, start-up assistance and final documentation of the facilities for Talisman at Offshore Sabah & Sarawak. |
Provision for Hook-Up, Commissioning and Topside Major Maintenance Services for 2013 to 2017 |
Petrofac Malaysia Limited |
Detailed engineering, procurement, fabrication, onshore testing and pre-commissioning, transportation, hook-up & commissioning, start-up assistance and final documentation of the facilities for Petrofac |
Detailedengineering, procurement, fabrication, onshore testing and pre-commissioning, transportation, hook-up & commissioning, start-up assistance and final documentation of the facilities for Petrofac facilities at Offshore Terengganu |
Provision of Onshore Pre-Fabrication and Offshore Modification Works for East Belumut Drilling Phase Iii 2nd Revisit, East Piatu Drilling Phase III & IV |
Newfield Peninsula Malaysia Inc |
Onshore Prefabrication and Offshore Modification Works for: . East Belumut Drilling Phase III 2nd Revisit . East Piatu Drilling Phase III . East Piatu Drilling Phase IV |
Onshore Prefabrication and Offshore Modification Works for: . East Belumut Drilling Phase III 2nd Revisit . East Piatu Drilling Phase III . East Piatu Drilling Phase IV |
Provision for Hook-Up, Commissioning and Topside Major Maintenance Services for 2013 To 2018 |
Newfield Peninsula Malaysia Inc |
Detailed engineering, procurement, fabrication, onshore testing and pre-commissioning, transportation, hook-up & commissioning, start-up assistance and final documentation of the facilities for Newfield |
Detailed engineering, procurement, fabrication, onshore testing and pre-commissioning, transportation, hook-up & commissioning, start-up assistance and final documentation of the facilities for Newfield facilities at Offshore Terengganu and Offshore Sabah & Sarawak |
Provision for Hook-Up, Commissioning and Topside Major Maintenance Services for 2013 to 2017 |
Petrofac Malaysia Limited |
Detailed engineering, procurement, fabrication, onshore testing and pre-commissioning, transportation, hook-up & commissioning, start-up assistance and final documentation of the facilities for Petrofac |
Detailedengineering, procurement, fabrication, onshore testing and pre-commissioning, transportation, hook-up & commissioning, start-up assistance and final documentation of the facilities for Petrofac facilities at Offshore Terengganu |
Provision of Onshore Pre-Fabrication and Offshore Modification Works for East Belumut Drilling Phase Iii 2nd Revisit, East Piatu Drilling Phase III & IV |
Newfield Peninsula Malaysia Inc |
Onshore Prefabrication and Offshore Modification Works for: . East Belumut Drilling Phase III 2nd Revisit . East Piatu Drilling Phase III . East Piatu Drilling Phase IV |
Onshore Prefabrication and Offshore Modification Works for: . East Belumut Drilling Phase III 2nd Revisit . East Piatu Drilling Phase III . East Piatu Drilling Phase IV |
Project Name |
Owner |
Scope of Services (PCC, EPC, EPCC etc.) |
Description ( of Work Executed) |
Provision For Onshore Pre-Fabrication And Offshore Modification For PM318 Crude Oil And Cost Optimization Project |
Newfield Peninsula Malaysia Inc |
Fabrication And Offshore Modification For Pm318 Crude Oil And Cost Optimization Project. (Onging work, the manhours is only estimated) |
Fabrication And Offshore Modification For Pm318 Crude Oil And Cost Optimization Project. (Onging work, the manhours is only estimated) |
Design, Built and Operation of accommodation & Pipe Lay Barge Kota Laksamana 101 in Lumut GOM Shipyard. |
KLM Sdn Bhd |
Only Barge main structure and hull fabrication work was subcontract to shipyard fabricator. Other work such as project management, supervison of hull and balance of plant (BOP) detail engineering work (by engineering firm), procurement, BOP pre-fabrication, installation, hook-up, tie-ins, testing and commissioning for start-up and ready for operation of Pipelay Barge. BOP is including hydraulic & galvanised piping, gen. set, pump system, water maker system, accomodation system, navigation & communication system etc. |
Only Barge main structure and hull fabrication work was subcontract to shipyard fabricator. Other work such as project management, supervison of hull and balance of plant (BOP) detail engineering work (by engineering firm), procurement, BOP pre-fabrication, installation, hook-up, tie-ins, testing and commissioning for start-up and ready for operation of Pipelay Barge. BOP is including hydraulic & galvanised piping, gen. set, pump system, water maker system, accomodation system, navigation & communication system etc. |
Provision for Onshore Fabrication and Offshore Modification for PM329 East Piatu Inhection and Drilling Phase II |
Newfield Peninsular Malaysia Inc. |
Onshore pre-fabricationand offshore modification and installation for PM329 East Piatu platform |
Preparation of Work Package including procurement activities for pre-fabrication and offshore Hook-up and Commissioning. |
Project Name |
Owner |
Scope of Services (PCC, EPC, EPCC etc.) |
Description ( of Work Executed) |
Provision for offshore hook up and commissioning of PM329 East Piatu Wellhead Platform for Newfield Peninsular LTD |
Newfield Peninsular Malaysia Inc |
Preparation of work package, jobcard corrdinate with module fabricator (KHL) and supply of engineering personnel skill manpower, equipment and tools for offshore. |
Hook-up tie-ins, testing and commissioning of East Piatu CPP and WH platform |
Provision of Onshore Pre-Fabrication & Offshore Modification Works for PM323 Tinggi-A to Tiong-A Oil Evacuation Pipeline Project |
Newfield Peninsular Malaysia Inc. |
Engineering development work (Work Package) & procurement for Hook-up, tie-ins, testing and commissioning of Host-Tie ins facilities on Tinggi A & Tiong A Platform. |
Preparation of Work Package including procurement activities for pre-fabrication and offshore Hook-up and Commissioning. |
Provision of Riser repair for Petronas Carigali Sdn Bhd - Sabah Operations |
PCSB-SBO |
Engineering development work (Work Package) & procurement for Hook-up, tie-ins, testing and commissioning of 8 no's of Riser for Sematang Field (Brownfield facilities). |
Preparation of Work Package including procurement activities for pre-fabrication and offshore Hook-up and Commissioning. |
Provision for Onshore Pre-fabrication and Offshore Modification Works of Chemingat & East Belumut Facilities |
Newfield Peninsular Malaysia Inc |
Engineering development work (work package) & procurement for Hook-up, tie-ins, testing and commissioning of various structural work, process abd utilities system. |
Preparation of Work package including procurement activities for pre-fabrication and offshore Hook-up and Commissioning for the modification of Chemingat and East Belumut Facilities. |
Provision for Noise Barrier Wall for East Belumut Platform |
Newfield Peninsular Malaysia Inc |
Detail Engineering design, Procurement, Pre-fabrication, Offshore Installation and Testing of Noise Barrier Wall for East Belumut |
Hook-up, Tie-ins and testing of new facilities with the existing facility on the platform. |
Project Name |
Owner |
Scope of Services (PCC, EPC, EPCC etc.) |
Description ( of Work Executed) |
EPCC of the Upgrading of Fuel Oil Bunkering Facilities at Bintulu, Sarawak for PDB |
Petronas Dagangan Bhd (As Main Contractor) |
Detail Engineering design, Procurement, Construction and Commissioning of 16" x 5km of Multiproduct Transfer pipeline, Bunkering Facilities and Export Facilities from MLNG to Bintulu Export Terminal. |
16" x 5km pipeline (under & above ground), Custody Transfer Metering, Sales Metering, Process Pumps, upgrading of process piping, electrical & instrument system. |
Provision for Onshore Pre-fabrication and Offshore Modification Works of Chemingat & East Belumut Facilities |
Newfield Peninsular Malaysia Inc |
Engineering development work (work package) & procurement for Hook-up, tie-ins, testing and commissioning of various structural work, process abd utilities system. |
Preparation of Work package including procurement activities for pre-fabrication and offshore Hook-up and Commissioning for the modification of Chemingat and East Belumut Facilities. |
Provision for Noise Barrier Wall for East Belumut Platform |
Newfield Peninsular Malaysia Inc |
Detail Engineering design, Procurement, Pre-fabrication, Offshore Installation and Testing of Noise Barrier Wall for East Belumut |
Hook-up, Tie-ins and testing of new facilities with the existing facility on the platform. |
Pre-fabrication, hook -up and commmissioning activites for Samarang Pipeline Replacement Project at SMP-A , SMP-C and SMJT-C (Topside Portion) for PL110, PL108, PL129 & PL109 |
PCSB SBO |
Detail engineering design, procurement , prefabrication and offshore installation of pipeline riser repair / replacement |
Preparation of Work package including procurement activities for pre-fabrication and offshore Hook-up and Commissioning |
Project Name |
Owner |
Scope of Services (PCC, EPC, EPCC etc.) |
Description ( of Work Executed) |
Angsi C Boatlanding Fabrication & Installation |
PCSB/Tanjung Offshore |
Procurement of structural material, onshore pre-fabrication |
Procurement of structural material, onshore pre-fabrication at PBJV Paka Fabrication Yard, transportation to MMHE yard in Pasir Gudang and Trial Fit at MMHE yard prior to load out. |
LGAST to PML Pipeline Project |
Petronas Carigali Sdn Bhd/PML (As Main Contractor) |
Procurement, Construction and Commissioning work - exclude supply of line pipe material |
12" x 12 km, Labuan FT, include 3 km of sub-sea section with two Shore Approach construction and two tie-ins work at LGAST and GRT-2 in PML new Methanol plant, which involve installation & tie-ins of receiving and metering facilities. |
Project Name |
Owner |
Scope of Services (PCC, EPC, EPCC etc.) |
Description ( of Work Executed) |
Installation of Samarang Riser Guard at Sabah |
PCSB SBO |
Work involved data gathering of existing platform Jacket Drawing from PCSB-SBO archived library and then prepare detail engineering design work (sub-contract to others), procurement of structural material, onshore pre-fabrication and offshore installation.? |
Site survey, including diving work. Onshore pre fabrication at Labuan Fabrication yard . Total of 244MT of structural works offshore transportation and installation |
Procurement, fabrication, hook-up and commissioning of pig trap at Samarang field (SMJT-C, SMJT-D, SMJT-F at Sabah |
PCSB SBO |
Involved pre-fabrication of tie-ins spool, structural supports, extension deck or access? platform and offshore installation tie-ins during 2 weeks shutdown window in Feb 08? and post installation & commissioning work. |
Removal and modification of exising Launcher / Receiver facilities and its associated piping work on Semarang Topsides (6 platforms) |
Project Name |
Owner |
Scope of Services (PCC, EPC, EPCC etc.) |
Description ( of Work Executed) |
Semarang Pipeline Upgrade |
Petronas Carigali Sdn Bhd - SBO |
|
EPCC 10's of Launcher/Receiver on 4 platform at Semarang field, including supply of marine spread. |
Project Name |
Owner |
Scope of Services (PCC, EPC, EPCC etc.) |
Description ( of Work Executed) |
TTLR Upgrading Work |
Petronas Dagangan Bhd (As Main Contractor) |
EPCC of Tank Truck Loading Rack facility at PDB Kerteh Refinery Loading facility. |
Process piping, Metering Facility (Skid), FW System, Loading Arm System, Process Pumps, electrical system and Instrument & control system? |
|